Winter Storm Warning Yolo County / State of CALocal Weather Alerts

Winter Storm Warning
...significant Mountain Snow Today Into The Weekend... .a Significant Early Season Storm Is Forecast To Bring Snow And Wind To The Mountains Of Interior Northern California Through Saturday Evening. A Couple Of Feet Of Snow Are Possible Above 6000 Feet By Saturday Night Over The Higher Elevations. Motorists Planning Travel Into The Mountains During This Time Frame Should ...Read More.
Effective: November 3, 2017 at 2:53pmExpires: November 4, 2017 at 11:00pmTarget Area: West Slope Northern Sierra Nevada; Western Plumas County, Lassen Park

Winter Storm Warning
...winter Storm Warning Remains In Effect Until 11 Pm Pdt Saturday... * What...heavy Snow Expected. Plan On Difficult Travel Conditions Especially Over The Passes. Total Snow Accumulations: Above 7000 Feet 1 To 2 Feet With Localized Higher Amounts. Between 6500 And 7000 Feet 5 To 10 Inches With ...Read More.
Effective: November 3, 2017 at 2:47pmExpires: November 4, 2017 at 11:00pmTarget Area: Greater Lake Tahoe Area

Winter Storm Warning
...winter Storm Warning Remains In Effect From 5 Am Pdt Saturday To 4 Pm Pst Sunday Above 7000 Feet... * What...heavy Snow Expected. Plan On Difficult Travel Conditions. Total Snow Accumulations Of 3 To 5 Inches, With Localized Amounts Up To 10 Inches, Are Still Expected. * Where...sierra Nevada Mountains From Yosemite To Kings Canyon ...Read More.
Effective: November 4, 2017 at 5:00amExpires: November 5, 2017 at 5:00pmTarget Area: Sierra Nevada from Yosemite to Kings Canyon

PG&E Training Center

PG&E is on its way to construction!! Due to the wet conditions, PG&E will be working through the weekends.

PG&E’s Gas Operations Technical Training Center in Winters

PGE

A natural gas vocational training center, operating indoors M-F (7am-10pm) and weekends (7am-7pm) and outdoor activities 7 days a week (7am-7pm). There will be approximately 210 people on site every day, comprised of 63 employees and 147 students.

Description

Construction of a comprehensive gas training facility for the training of gas field employees on all of the aspects of construction, maintenance and operation of the PG&E gas system.  The functions of the components on the site include:

  • Parking Lot
  • Learning Center - Primary technical training center building, including classrooms; labs; M&C tech enter (e.g. The Indoor Flow Lab wherein compressed air is used to simulate natural gas flow), gas service representative (GSR) area, where gas serveie representatives will be trained in customer service including, meters, leak detection and service inspections; storage; instructor offices; food services; restrooms; lockers and ancillary support uses.
  • T&D Building - A partially enclosed building consisting of enclosed classrooms, lab and equipment storage: and an outdoor training field used to train basic utility worker skills and safe operations in confined spaces.
  • OQ - The proposed project will also include a vehicle and equipment parking area and OQ trailer parking in the east of the site.
  • Crane Certification - A gravel surfaced pad upon which three to five truck-based boom cranes will be located to train students how to operate crane equipment in the field.
  • Transmission - An outdoor area consisting of several training areas (all using compressed air to simulate gas operations) including the pipeline inspection area which will be used to train students in the insertion and retrieval of inspection apparatus into pipelines under transmission and/or distribution pressure; the simulated gas storage wellhead area which will include a gas storage wellhead area which will include a gas storage wellhead to train students in the injection and storage of natural gas at underground storage facilities; the cold pits area which will simulate gas pipe and meter vaults, gas pipeline pits, and pipe runs; and the hydrostatic testing area which will train the procedures and skills necessary to utilized pressured water to test pipeline for leaks and strength.
  • Cathodic Protection - An open field training area wherein students will be trained in the use of cathodic protection methods.
  • Utility Village - A small-scale replica of a residential neighborhood used to train field service representatives on customer interface, leak detection, location and marking of existing pipelines, and emergency response scenario training.
  • Equipment Training - An excavation technique training area which will include embankments; structures; pavements (or other hard surfaces); and underground obstacles used to train students in the operation of backhoes, mini-excavators, vacuum excavators, horizontal drill rigs, and other similar equipment.  Additionally, this area will be utilized to train students in soil management techniques,

Contractors: DPR, from its Sacramento office, is PG&E's selected general contractor for the training center. DPR will solicit bids from prequalified subcontractors for the PG&E GOTTC project, most likely in phases, with the first phase related to site work in late summer of this year. Prior to the bidding period, DPR will host an outreach event in the Winters community (date/location to be determined) to communicate the project and bid process to prospective bidders. Contractors that are interested in the project can reach out to DPR's point of contact Nils Bloomquist, information below.

Nils Blomquist | DPR Construction
2480 Natomas Park Drive, Suite 100
Sacramento, CA 95833
Office phone: 916-568-3434

05/29/15 Notice of Availability of the Final Environmental Impact Report for the Winters Pacific Gas and Electric Gas Operations Technical Training Center Project and Notice of Public Meeting/Hearing on the Project (PDF)

05/29/15 Final Environmental Impact Report (PDF)


Search:

Department Links:

-City Clerk

-City Council

-City Council Agendas

-City Manager

-City Manager's Update

-Economic Advisory Committee*

-Future Leaders*

-Hispanic Advisory Committee*

-Personnel

-Planning Commission

-Putah Creek Committee

-Administrative Forms and Reports

-Website Posting Requirements


Note: to view online City documents, you will need Adobe Acrobat Reader software installed on your computer. Click to visit Adobe's download page (external website).